One of the most common questions we get after "how much will it cost" is "how long will it take" - and the honest answer depends entirely on what you're having removed. Here's a realistic breakdown.
Small, single-area jobs: usually one day
- Fence removal - most residential fences, done in a day
- Small shed or garage roof - typically a single day
- One room's worth of eaves or wall sheeting - usually a day
Medium jobs: one to two days
- Full-house eaves removal - running the entire perimeter takes longer than a single wall
- Standard residential roof removal - most homes are done in a day, larger or more complex roofs may need two
- Ceiling removal - containment setup adds time compared to exterior work
Larger and commercial jobs: scoped individually
Commercial and industrial jobs - factory roofs, large retail sites, multi-building properties - don't fit a standard timeframe. These get scoped and quoted with a specific schedule based on area, access, and whether the site needs to stay operational during the work.
What adds time to any job
- Access difficulties - steep roofs, tight side access, multi-storey buildings
- Air monitoring requirements - required by law for larger jobs, adds a clearance step before the site reopens
- Weather - asbestos removal doesn't happen in the rain, for both safety and practical reasons
- Scope surprises - occasionally more material is found once work begins than the initial inspection suggested
The one promise we'll always make
Whatever the job, you'll get a realistic timeframe in your quote - not a vague "a few days" that stretches out once we're on site. If something changes the schedule, you'll hear about it from us before it becomes a surprise.